ELIS 1.9 Manual

Reporting

Course Completion Gas Guage

The Course Completion Gas Gauge report shows the status of all users in a course. The gas gauge itself shows the percentage of students that have completed the course.

Report Requirements


This report requires completion elements in the ELIS course. If a course/class doesn't have completion elements, the class data will not be included in this report.


Report Filter


The report filter has two fields, Course and Inactive. Neither field is required. To generate a report for every course on the site leave the Course field set to "any value". To generate a report for a specific course, select one from the Course drop down menu. Inactive users, active users, or all users can be included in this report. To select all users, leave the Inactive field set to "any value".

Course completion gas gauge report filter

The next image shows a Course Completion Gas Gauge report. The report is showing the status of all the users in the course and the percentage of those students that have completed the course.

Explanation of report data:
  1. Class -- the class instance the learner is enrolled in.
  2. Status --refers to the learner's completion status in the course. If the learner has met completion requirements for the course, his/her status will be marked as complete.
  3. Student -- the indivdual learners enrolled in the course. Selecting the learner's name will run the learner's Individual User Report.
  4. % Complete --This is the percent of completion elements that have been completed by the learner.
  5. # Complete -- This number represents the number of completion elements in the course that have been completed by the learner.
  6. Score -- Learner's current total percent grade in the course.

Course completion gas gauge report

To change report options, click on the "Configure Parameters" icon located in the upper left hand corner of the report.

To schedule the report to run at specific time(s) in the future, select the "Schedule Reports" icon in the upper right hand corner of the report. For details on setting report parameters when scheduling reports, please see the report scheduling documentation.

The report can be exported in PDF or CSV format. To export the report, select either the "Download PDF" or "Download CSV" icons located in the upper left hand corner of the report. The report will download locally to your computer.

Report data can be updated automatically, without needing to go back to the report parameters, by clicking the "Refresh" button located at the bottom center of the report page.